Skip to content
Surrey Tiling & Bathrooms home
The journal

Questions to Ask a Bathroom Fitter Before You Hire

Glen Hughes

Questions to Ask a Bathroom Fitter Before You Hire

The questions that matter most before hiring a bathroom fitter are about what's included, who does each trade, how the shower is waterproofed, how long it will take, what certificates you'll get, and how payment works. Good fitters answer all of them easily and in writing. Vague answers to any of them are the clearest warning sign you'll get before work starts.

About the quote

  • Is the quote itemised? You want to see strip-out, plumbing, electrics, boarding, tanking, tiling, fitting and making good as separate lines, not a single figure.
  • Does it include the products, or just labour? If you're supplying the suite or tiles, ask them to check the specifications before you buy.
  • What isn't included? Decorating, skip hire, disposal of the old suite, flooring outside the bathroom and making good to the ceiling below are common gaps.
  • What happens if you find a problem? Rotten joists or old pipework can't always be seen until the room is stripped. Ask how surprises are priced and agreed before extra work goes ahead.

About the work

  • How will the shower be waterproofed? The answer should name a tanking system and where it goes. "Good silicone" isn't waterproofing. See bathroom tanking.
  • Who does the plumbing and electrics? One team, or separate trades you'll need to coordinate? Each handover between trades is a chance for delays.
  • How will you set out the tiles? A fitter who plans the layout before fixing can tell you where the cuts will fall.
  • Will the floor need work? Especially for a walk-in shower, wet room or heavy bath.

About timing and disruption

  • How long will it take on site, in working days? And can you have a stage-by-stage schedule? Our guide to how long a bathroom refit takes gives realistic ranges to compare against.
  • When could you start?
  • Will products be on site before the strip-out? A job that stops halfway for a delivery leaves you without a bathroom.
  • How will you protect the house? Dust sheets, floor protection, the route in from the front door.

About paperwork and protection

  • What certificates will I get? Notifiable electrical work should come with a certificate, and some drainage or structural work needs building control sign-off. See building regs for a new bathroom.
  • Are you insured? Ask about public liability insurance, and ask to see it.
  • What guarantee do you give on workmanship? And what do manufacturers guarantee on the products?
  • Can I see recent work or speak to past customers?

About payment

  • What deposit do you need, and what is it for? A deposit towards ordering products is normal; a large upfront payment for labour is not.
  • When are stage payments due? Payments should follow progress, with the final payment after handover and snagging.
  • How do you agree changes? Any variation to the job and its price should be agreed in writing before the work is done.

Under the Consumer Rights Act 2015, a trader must carry out a service with reasonable care and skill. A clear written quote and agreement make it much easier to rely on that if something goes wrong.

Red flags

  • A single-line quote with no breakdown.
  • No mention of waterproofing for a shower.
  • Pressure to decide on the spot, or a "discount if you book today".
  • A large cash payment upfront.
  • No written agreement, or reluctance to put changes in writing.
  • No idea what's notifiable or what certificates you'll get.

FAQs

How many quotes should I get?

Two or three is usually enough to compare. More useful than the number is getting each quote on the same basis -- the same layout, products and scope -- so you're comparing like for like rather than one fitter's cheaper assumptions against another's.

Should I pick the cheapest quote?

Not on price alone. The difference between quotes is often in what's left out: tanking, floor preparation, disposal or making good. Compare line by line, and ask the cheapest fitter what they've excluded. A slightly higher quote that includes everything is usually cheaper than a low one that grows once work starts.

Ask us anything on this list. We'll answer in writing with your estimate. See how our bathroom refurbishments work or request a free home visit.

Your vision, our expertise

Inspired to start your own project?

Book a free consultation and we'll talk through ideas, materials and budget for your space.